Canon imagePRESS C10000VP/C8000VP Service Manual and Parts Catalog


Accurate, clear and concise text, combined with detailed illustrations, lists of error code, instruction and diagrams, guide you through procedure of repair, remediate, maintenance and adjustments your copier, printer or scanner.
Present service manual and parts catalog Canon imagePRESS C10000VP/C8000VP contain clear instructions and procedures on how to fix the problems occurring in your equipment.
Format of the manual: PDF, makes it easy to navigate, instant download and print. English language.
Table of contents:

SAFETY PRECAUTIONS
Laser Safety
Handling of Laser System
Turn power switch ON
Safety of Toner
About Toner
Toner on Clothing or Skin
Notes When Handling a Lithium Battery
Points to Note before Servicing
Points to Note at Cleaning

1. PRODUCT OVERVIEW
Product lineups
Host machine
Pickup/Delivery System Options
Scanning System Options
Function expansion system options
Features
Product Features
Features at servicing
Specifications
Product Specifications
Power Supply Specifications
Weight and Size
Productivity (Print Speed)
Paper type
Name of Parts
External View
Cross Section View
Power Switch
Control Panel

2. TECHNICAL EXPLANATION
Basic Configuration
Functional Configuration
Controller System
Overview
Controls
Laser Exposure System
Overview
Controls
Image Formation System
Overview
Controls
Fixing System
Overview
Controls
Pickup Feed System
Overview
Controls
External Auxiliary System
Counter Control
Fan Control
Power supply
Protection function
Power-saving Function
Effect of the Hub Which Supports Spanning Tree
Embedded RDS
Product Overview
Limitations
Service cautions
E-RDS Setup
Error code and strings
Updater
Functional Overview
Limitations and Cautions
Preparation
System Management Operations
Maintenance
FAQ
DCM
Function Overview
Export All by Remote UI
Import/Export by Service Mode (External)
Import/Export by Service Mode (Internal)
List of items which can be imported

3. PERIODICAL SERVICE
Periodical Service Operation Item
Process Unit
Primary Charging Assembly
Developing Assembly
ITB Unit (1/2)
ITB Unit (2/2)
Secondary Transfer Unit
Registration Feed Unit
Filter
Primary Fixing Assembly (1/3)
Primary Fixing Assembly (2/3)
Primary Fixing Assembly (3/3)
Secondary Fixing Assembly (1/3)
Secondary Fixing Assembly (2/3)
Secondary Fixing Assembly (3/3)
Tandem Pass / Bypass Pass / Fixing Merging Pass Unit
Delivery Reverse Unit
Duplex Decurler Unit
Options

4. PARTS REPLACEMENT AND CLEANING
List of Parts
External / Internal Cover
Main Unit
Electrical Components
Main Controller System
Replacing the Main Controller PCB 1
Replacing the VIDEO PCB
Replacing the HDD
Replacing the Main Controller PCB 2
Replacing the DC Controller PCB
Laser Exposure System
Dustproof Glass (Y/M/C/Bk) Cleaning Procedure
Replacing the Laser Scanner Units (Y/M/C/Bk)
Image Formation System
Replacing the Primary Charging Assemblies (Y/M/C/Bk)
Replacing the Primary Charging Wire Cleaning Motor HP Sensors (Y/M/C/Bk)
Replacing the Primary Charging Assembly Grid Plate (Y/M/C/Bk)
Replacing the Primary Charging Assembly Grid Plate Cleaning Pad (Y/M/C/Bk)
Replacing the Primary Charging Wire Unit (Y/M/C/Bk)
Replacing the Primary Charging Assembly Shield Plate (Y/M/C/Bk)
Replacing the Primary Charging Wire Cleaning Pad Holder (Y/M/C/Bk) and Primary Charging Wire
Cleaning Pad Slider (Y/M/C/Bk)
Replacing the Primary Charging Wire (Y/M/C/Bk)
Replacing the Drum Units (Y/M/C/Bk)
Replacing the Drum Cleaning Units (Y/M/C/Bk)
Replacing the Drum Cleaning Front/Rear Edge Seals (Y/M/C/Bk)
Replacing the Drum Cleaning Blades (Y/M/C/Bk)
Replacing the Pre-exposure Lamp Units (Y/M/C/Bk)
Replacing the Photosensitive Drums (Y/M/C/Bk)
Replacing the Drum Cleaning Pre-exposure Units (Y/M/C/Bk)
Cleaning the Drum Cleaning Pre-exposure Units (Y/M/C/Bk)
Replacing the Drum Cleaning Kits (Y/M/C/Bk)
Replacing the Drum Cleaning Brush Rollers (Y/M/C/Bk)
Cleaning the Drum Patch Sensors (Y/M/C/Bk)
Replacing the Developing Assembly Lower Plate (Y/M/C/Bk)
Cleaning the Developing Assembly Lower Plate (Y/M/C/Bk)
Replacing the Drum Patch Sensors (Y/M/C/Bk)
Replacing the Potential Sensor
Pulling out the Process Units (Y/M/C/Bk)
Cleaning the Drum Unit Support Shaft (Y/M/C/Bk)
Pulling out the Pre-registration/Feed Unit
Replacing the Secondary Transfer Outer Belt Unit
Replacing the Secondary Transfer Outer Belt Tension Roller
Replacing the Secondary Transfer Outer Belt
Replacing the Secondary Transfer Outer Roller
Replacing the Secondary Transfer Outer Roller Grounding Spring 1
Replacing the Secondary Transfer Outer Roller Grounding Spring 2
Replacing the Secondary Transfer Cleaning Unit Edge Seal Bases (Rear and Front)
Replacing the Secondary Transfer Cleaning Unit
Replacing the Secondary Transfer Cleaning Case
Replacing the Secondary Transfer Cleaner Drive Unit (9,000,000 Sheets)
Cleaning the Secondary Transfer Cleaner Drive Unit (1,000,000 Sheets)
Replacing the Secondary Transfer Scraper Sheet
Replacing the Secondary Transfer Cleaning Brush Roller (Right/Left)
Replacing the Secondary Transfer Bias Roller Cleaning Blade
Replacing the Secondary Transfer Inlet Lower Guide
Secondary Transfer Inlet Lower Guide / Secondary Transfer Outlet Separation Guide Cleaning
Procedure
Pulling out the ITB Frame Unit
Replacing the Leading Edge Registration Patch Sensor Cleaning Shutter
Leading Edge Registration Patch Sensor Cleaning Procedure
Replacing the ITB Cleaning Unit
Replacing the ITB Cleaning Brush Roller
Replacing the ITB Cleaning Blade
Replacing the Secondary Transfer Inner Roller Unit
Replacing the Secondary Transfer Inlet Upper Guide
Replacing the ITB
Cleaning the ITB Idler Roller
Cleaning the ITB Steering Roller
Cleaning the ITB HP Sensor
Cleaning the ITB Edge Sensor
Replacing the ITB Inner Surface Cleaning Scraper Unit
Replacing the ITB Torque Limiter
Replacing the Primary Transfer Roller (Y/M/C/Bk)
Replacing the Process Unit Cover
Replacing the Sub Hopper Stirring Motors (Y/M/C/Bk)
Releasing the Pressure of the ITB Unit
Replacing the Registration Patch Sensor Unit
Cleaning the Registration Patch Sensor Shutter, Registration Patch Sensors (Front/Middle/Rear),
and ITB Patch Sensors (Y/M/C)
Replacing the Developing Assemblies (Y/M/C/Bk)
Replacing the Sub Hoppers (Y/M/C/Bk)
Replacing the Color Sensor Unit
Cleaning the Color Sensor Unit
Moving the Toner Supply Assembly (when the POD Deck is not connected)
Moving the Toner Supply Assembly (when the POD Deck is connected)
Replacing the Hopper Unit (Y/M/C/Bk)
Fixing System
Replacing the Fixing Air Pump Unit
Pulling Out the Primary Fixing Assembly
Replacing the Primary Fixing Web Unit
Replacing the Primary/Secondary Fixing Web
Replacing the Primary Fixing Refresh Roller Cleaning Air Nozzle
Replacing the Primary Fixing Roller Collection Roller
Replacing the Primary Fixing Inner Delivery Unit
Replacing the Primary Fixing Assembly (when working with 1 person)
Replacing the Primary Fixing Assembly (when working with 2 or more people)
Replacing the Primary Fixing Pressure Belt Thermoswitch
Opening/Closing the Primary Fixing Upper Unit
Replacing the Primary Fixing Roller, Bearings, and Insulating Bushes
Cleaning the Primary Fixing Roller Sub Thermistor
Replacing the Primary Fixing Roller Sub Thermistor
Replacing the Primary Fixing Roller Main Thermistor
Cleaning the Primary Fixing Roller Thermoswitch
Replacing the Primary Fixing Roller Thermoswitch
Replacing the Primary Fixing Pressure Belt Unit
Replacing the Primary Fixing Pressure Belt
Replacing the Primary Fixing Pressure Belt Inner Oil Coating Roller
Replacing the Primary Fixing Pressure Belt Pressure Pad Cover and Primary Fixing Pressure Belt
Pressure Pad
Replacing the Primary Fixing Pressure Belt Steering Roller
Replacing the Primary Fixing Pressure Belt Inlet Thermistor
Replacing the Primary Fixing Pressure Belt Bearings 1, 3, 4 and 5 and the Primary Fixing Pressure
Belt Bushings
Cleaning the Primary Fixing Inlet Guide
Replacing the Primary Fixing External Heat Belt Unit
Replacing the Primary/Secondary Fixing External Heat Roller Thermistor
Replacing the Primary/Secondary Fixing External Heat Cleaning Roller
Replacing the Primary/Secondary Fixing External Heat Lower Roller Thermoswitch
Replacing the Primary/Secondary Fixing External Heat Upper Roller Thermoswitch
Replacing the Primary/Secondary Fixing External Heat Upper Roller Heater
Replacing the Primary/Secondary Fixing External Heat Lower Roller Heater
Replacing the Primary/Secondary Fixing External Heat Belt/Roller Bearings/Insulating Bushes
Replacement of the Primary/Secondary Fixing External Heat Drawer Harness Unit
Replacing the Primary Fixing Refresh Roller
Cleaning the Primary Fixing Delivery Lower Separation Claw
Replacing the Primary Fixing Delivery Lower Separation Claw
Cleaning the Primary Fixing Inner Delivery Separation Air Nozzle
Replacing the Primary Fixing Inner Delivery Separation Air Nozzle
Cleaning the Primary Fixing Inner Delivery Connection Lower Guide and Roller
Replacing the Primary Fixing Inner Delivery Lower Roller
Replacing the Primary Fixing Sub Station Air Flow Unit
Pulling Out the Secondary Fixing Assembly
Replacing the Secondary Fixing Web Unit
Replacing the Secondary Fixing Refresh Roller Cleaning Air Nozzle
Replacing the Secondary Fixing Roller Collection Roller
Replacing the Secondary Fixing Inner Delivery Unit
Replacing the Secondary Fixing Assembly (when 1 person working alone)
Replacing the Secondary Fixing Assembly (when working with 2 or more people)
Opening/Closing the Secondary Fixing Upper Unit
Replacing the Secondary Fixing Roller, Bearings, and Insulating Bushes
Cleaning the Secondary Fixing Roller Sub Thermistor
Replacing the Secondary Fixing Roller Sub Thermistor
Replacing the Secondary Fixing Roller Main Thermistor
Cleaning the Secondary Fixing Roller Thermoswitch
Replacing the Secondary Fixing Roller Thermoswitch
Replacing the Secondary Fixing Pressure Roller, Bearings, and Insulating Bushes
Cleaning the Secondary Fixing Pressure Roller Sub Thermistor
Replacing the Secondary Fixing Pressure Roller Sub Thermistor
Replacing the Secondary Fixing Pressure Roller Main Thermistor
Replacing the Secondary Fixing Pressure Refresh Cleaning Roller
Replacing the Secondary Fixing Pressure Refresh Roller
Cleaning the Secondary Fixing Inlet Guide
Replacing the Secondary Fixing Pressure Roller Thermoswitch
Replacing the Secondary Fixing External Heat Belt Unit
Replacing the Secondary Fixing Refresh Roller
Cleaning the Secondary Fixing Delivery Lower Separation Claws
Replacing the Secondary Fixing Delivery Lower Separation Claws
Cleaning the Secondary Fixing Inner Delivery Upper Separation Plate
Replacing the Secondary Fixing Inner Delivery Upper Separation Plate
Replacing the Secondary Fixing Inner Delivery Lower Roller
Replacing the Primary Fixing Refresh Air Blow Valve Unit
Replacing the Secondary Fixing Refresh Air Blow Valve Unit
Replacing the Atmospheric Pressure Relief Valve Unit
Replacing the Relief Valve Unit
Replacing the Pressure Gauge Unit
Replacing the Air Filter Unit
Replacing the Fixing Air Tube Filter
Replacing the Fixing Air Pump Filter
Pickup / Feed System
Replacing the Pre-fixing Feed Right Unit
Replacing the Main Station Duplex Feed Right Unit
Replacing the Main Station Duplex Feed Middle Unit
Replacing the Main Station Duplex Feed Left Unit
Cleaning the Pre-fixing Feed Sensor 1/Secondary Transfer Outlet Sensor
Replacing the Cross-feed Unit
Replacing the Cross-feed Roller Cleaning Member
Replacing the Cross-feed Roller
Cleaning the Cross-feed Roller Cleaning Member, Cross-feed Unit, and Cross-feed Rollers
Pre-fixing Feed Belt Cleaning Procedure
Cleaning the Pre-fixing Feed Belt Cleaning Brush
Replacing the Pre-fixing Feed Left Unit
Cleaning the Tandem Feed Roller 1, Tandem Slave Roller 1, Tandem Feed Roller 2, Tandem Slave
Roller 2, and Tandem Guides
Cleaning the Bypass Feed Roller 1, Bypass Slave Roller 1, Bypass Feed Roller 2, Bypass Slave
Roller 2, Bypass Feed Roller 3, Bypass Slave Roller 3, and Bypass Guide
Replacing the Sub Station Duplex Feed Left Unit
Replacing the Sub Station Duplex Feed Right Unit
Replacing the Tandem Feed Unit
Replacing the Tandem Feed Roller 1 and Tandem Feed Roller 2
Replacing the Bypass Feed Unit
Replacing the Bypass Feed Roller 1/ Bypass Feed Roller 2/Bypass Feed Roller 3
Replacing the Fixing Merging Path Unit
Replacing the Fixing Merging Path Feed Belts
Replacing the Fixing Merging Bypass Decurler Slave Roller and the Fixing Merging Bypass Decurler
Drive Roller
Cleaning the Fixing Merging Unit Bypass Decurler Drive Roller
Replacing the Fixing Merging Unit (Lower)
Replacing the Tandem Feed Roller 3
Replacing the Bypass Feed Roller 4
Cleaning the Fixing Merging Path Feed Belt Opposition Roller
Cleaning the Tandem Feed Roller 3, Tandem Feed Slave Roller 3, and Fixing Merging Guide
Cleaning the Bypass Feed Roller 4, Bypass Feed Slave Roller 4, and Fixing Merging Guide
Replacing the Duplex Decurler Unit
Replacing the Duplex Decurler Unit (Upper)
Replacing the Duplex Decurler Unit Feed Belts
Replacing the Duplex Decurler Slave Roller and Duplex Decurler Drive Roller
Pulling Out the Delivery/Reverse Unit
Cleaning the Delivery/Reverse Flapper Flag
Replacing the Color Sensor Unit Sponge Roller
Replacing the Delivery Decurler Slave Roller 2, Delivery Slave Roller 1, and Delivery Slave Roller 2
Cleaning the Delivery Roller 1, Delivery Slave Roller 1, Delivery Roller 2 and Delivery Slave Roller 2
Cleaning the Duplex Reverse Roller and Duplex Reverse Rear Roller
Replacing the Duplex Reverse Roller and Duplex Reverse Rear Roller
Replacing the Delivery Reverse Roller 1 and Delivery Reverse Roller 2
Replacing the S2M 30T Pulley/Delivery Roller 1/Delivery Reverse Front Roller
Cleaning the Delivery Reverse Roller 1/Delivery Reverse Roller 2/Delivery Reverse Rear Roller
Cleaning the Delivery Reverse Front Roller
Replacing the Delivery Roller 3
Replacing the Delivery Upper Guide Unit
Replacing the Delivery Guide (Lower) 3
Replacing the Delivery Decurler Slave Roller 1
Replacing the Delivery Roller 2
Replacing the Delivery Reverse Rear Roller
Cleaning the Delivery Decurler Roller Opposition Roller
Replacing the Delivery/Reverse Front Slave Roller
Replacing the Delivery/Reverse Unit One-way Clutch
Replacing the Delivery/Reverse Unit Decurler Backup Roller Cleaning Brushes
Replacing the Left/Right Deck Unit
Replacing the Left/Right Deck Pickup Unit
Replacing the Left/Right Deck Separation Pad
Replacing the Left/Right Deck Lifter Motor Unit
External / Auxiliary System
Replacing the Main Station Upper Right Suction Filters
Replacing the Main Station Upper Left Suction Filters
Replacing the Main Station Rear Ozone Filters (Y) / (M/C/Bk)
Replacing the Main Station Rear Toner Filters (Y/M/C/Bk)
Disassembling/Cleaning the Sub Station Exhaust Duct Unit Ozone Filter/Filter Base
Replacing/Cleaning the Sub Station Rear Middle Ozone Filter
Replacing the Power Unit Station Ozone Filter
Replacing the Sub Station Front Left Cover
Replacing the Waste Toner Container
Replacing the Main Station Front Upper Cove
Disengaging the Power Unit Station
Replacing the Main Station Rear Covers
Disengaging the Sub Station
Options
Replacing the Multi-purpose Tray Pickup Roller
Replacing the Multi-purpose Tray Separation Roller
Replacing the DADF + Reader Unit

5. ADJUSTMENT
Basic Adjustment
Image Position Adjustment
Adjusting the Side Registration
Density Adjustment of Color Sensor (Only When imagePRESS Server Is Installed)
When replacing parts
Main Controller
Laser Exposure System
Image Formation System
Fixing System
Pickup Feed System

6. TROUBLESHOOTING
Making Initial Checks
List of Initial Check Items
Test Print
Overview
Selecting Test Print TYPE
How to check test print
Image Adjustment Basic Procedure
Making Pre-Checks
Gradient adjustment in density between the front side and the rear side
Adjustment of density difference (1/3)
Adjustment of density difference (2/3)
Adjustment of density difference (3/3)
Troubleshooting Items
List of Troubleshooting Items
Failure diagnosis of the air flow in the fixing system
Wrinkles in the Pressure Belt
Forcible stop of paper feed
Message “Adjusting the fixing assembly” does not disappear
Power Supply Error Diagnosis Flow
Image failure
Image with Crepe Marks/Image with Scrawled Marks
Image of separation failure in the Primary Fixing Assembly
Lines in the vertical direction
Soiled image on the 1st side of 2-sided print
Soiled trailing edge/soiled paper edge on both sides of 2-sided print
Soiling of spots at Secondary Transfer Outer Belt intervals
Soiling of spots at ITB intervals
Bk soiling at the front edge on the back side
Vertical white line on solid image of each color
Vertical lines due to poor transfer at the ITB
Pinhole soiling (ring mark)
Soiled image due to paper dust
Lined image at the trailing edge of the 2nd side of 2-sided print
Lined image on the 1st side of 2-sided print
Image failure due to poor gradation performance
Soiled back (Slip-through of patch-like toner)
Toner soiling at the edge of 13 x 19 size paper
Actions to Be Taken When Hue Variation Occurs (imagePRESS Server B4100/B5100 Series)
Faulty Feeding
Measure against 0110JAM (Secondary Transfer Outlet Sensor Delay Jam)
Measure against 0112JAM (Pre-fixing Feed Sensor 2 Delay Jam)
Measure against 0300JAM (wrong detection of double feed) at feeding of Washi (JPN Paper)
Actions to Take When Paper Double Feed Occurs
Controller Self Diagnosis
Introduction
Overview
Basic Flowchart
Controller System Error Diagnosis
Debug log
Purpose
Overview
Collecting System Information
When to Obtain Logs
Network Packet Capture
Version upgrade
Overview
Version Upgrade via SST
Version Upgrade using USB flash drive Storage Device
Troubleshooting
Version Upgrade via CDS

7. ERROR/JAM/ALARM
Over View
Location Code
Pickup position code
Pickup size
Points to Note When Clearing MN-CON
Points to Note When Clearing HDD
Error Code
Error Code Details
Jam Code
Jam Type
Jam screen display specification
Host Machine (Main Station)
Host Machine (Sub Station)
Duplex Color Image Reader Unit-K1
POD Deck-D1
Secondary POD Deck-D1
POD Deck Lite-C1
Document Insertion Unit-N1
Paper Folding Unit-J1
Perfect Binder-E1
High Capacity Stacker-H1 / Secondary High Capacity Stacker-H1
Multi Function Professional Puncher-A1
Finisher-AN1 / Saddle Finisher-AN2
BOOKLET TRIMMER-D1
BOOKLET TRIMMER-F1
Two-Knife Booklet Trimmer-A1
Alarm Code
Alarm Code Details

8. SERVICE MODE
Overview
Entering Service Mode
Points to note when using Service Mode
Service Mode Menu
Service mode item explanations
I/O information enhancement
Display of Error Code/Alarm Code description
COPIER > OPTION > BODY, Item Segmentation
Security features
Switching Screen (Level 1 < - > 2)
Language switch
Back-up of service mode
The data output of the service data print
Introduction of situation mode
COPIER (Service mode for printer)
DISPLAY (State display mode)
I/O (I/O display mode)
ADJUST (Adjustment mode)
FUNCTION (Operation / inspection mode)
OPTION (Specification setting mode)
TEST (Print test mode)
COUNTER (Counter mode)
FEEDER (ADF service mode)
DISPLAY (State display mode)
ADJUST (Adjustment mode)
FUNCTION (Operation / inspection mode)
SORTER (Service mode for delivery options)
ADJUST (Adjustment mode)
FUNCTION (Operation / inspection mode)
OPTION (Specification setting mode)
MISC (Individual setting mode)

9. INSTALLATION
How to Check this Installation Procedure
Description on the parts included in the package
Symbols in the Illustration
Checking before Installation
Selecting the Installation Site
Checking the Installation Space
Order of Installing the Host Machine and Options
Points to Note When Moving This Host Machine
Explanation for Safety
Points to Note at Installation
Unpacking
Checking the Contents
Installation Procedure
Preparing the Starter
Positioning and Securing the Main Station
Before Installing the Deck
Before Installing the Feed Assembly
Installing the Secondary Transfer Outer Belt (Only When Secondary Transfer Outer Belt Is Included)
Engaging the Primary Transfer Roller
Connecting the Main Station and the Sub Station
Connecting the Waste Toner Connecting Pipe
Connecting the Main Station and Sub Station with the Cable
Connecting the Power Unit Station
Installing the Primary Fixing Assembly
Installing the Secondary Fixing Assembly
Installing the Duplex Feed Assembly
Installing the Waste Toner Receptacle
Installing the Process Unit
Installing the Image Reader Unit / Printer Cover
Installing the Upright Control Panel
Product Name
Checking before Installation
Checking the Contents
Installation Procedure
Installing Others
R-HDD Label
Service Book Holder
Turning ON the Main Power Switch
Registering the Speed License
Checking the Settings of the Image Reader Unit/Printer Cover
Setting the Toner Container
Supplying the Starter
Checking the Height of the Primary Charging Assembly
Executing Auto Adjust Gradation (Full Adjust)
Registering Paper to Adjust
Executing Correct Shading
Auto Correct Color Tone Settings (Register Correction Pattern)
Image Position Adjustment
Paper Settings
Affixing the Label
Checking the Serial Number
Setting Method when the High Capacity Stacker-H1 Is Installed
Record of Complete of Instruct to User
Connecting to the Network
When Relocating the Machine
Works Before Relocation
Works After Relocation
Tab Feeding Attachment-E1
Checking the Contents
Installation Procedure
Reader Heater Unit
Checking the Contents (Reader Heater Unit-G1)
Checking the Parts to be Installed (Europe, Australia only)
Check Items When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Cassette Heater Unit-32
Checking the Contents
Points to Note at Installation
Check Items when Turning OFF the Main Power
Installation Procedure
Voice Guidance Kit-F2
Points to Note at Installation
Check Items when Turning OFF the Main Power
Installation Outline Drawing
Checking the Contents
Installation Procedure
Checking the Settings
Operation Check
HDD-related Option
Points to Note at Installation
Combinations of HDD Options
Points to Note when Unpacking HDD Data Encryption & Mirroring Kit
Checking the Contents
Setting Before Turning OFF the Power
Check Item When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Installing the System Using SST
The download of the Maintenance Assist Tool
Checking the Security Version
Checking the Security Mark
Setting the Mirroring
Informing the System Administrator That Installation Is Complete
Executing Image Quality Adjustment
Long Sheet Tray-C1
Installation Outline Drawing
Checking the Contents
Installation Procedure

10. OPERATOR MAINTENANCE
Overview of Operator Maintenance
Operator Maintenance Parts
Preparation for Introduction
Target Equipment
List of Parts Requiring Replacement/Cleaning
Allocation of Work
Installation of Operator Maintenance Software
Initial Setting
Version Upgrade of Operator Maintenance Software
Introduction Workflow
Overview
Installation / Initial Settings
Replacement / Cleaning of Parts
Refurbishing the Fixing Assembly
Reconditioning of the Primary Charging Assembly and the Secondary Transfer Belt Unit

11. MAINTENANCE ASSIST TOOL
Maintenance Assist Tool
Introduction
Overview
Usage
Announcement

APPENDICES
Service Tools
Special Tools
Solvents and Oils
General Timing Chart
Basic Sequence
General Circuit Diagram
General Circuit Diagram – Main Station – 1/5
General Circuit Diagram – Main Station – 2/5
General Circuit Diagram – Main Station – 3/5
General Circuit Diagram – Main Station – 4/5
General Circuit Diagram – Main Station – 5/5
General Circuit Diagram – Sub Station – 1/2
General Circuit Diagram – Sub Station – 2/2
General Circuit Diagram – Power Unit Station – 1/2
General Circuit Diagram – Power Unit Station – 2/2
Backup Data
Detail of HDD partition
Soft Counter List
Soft counter specifications
Removal
Overview
Work Procedure

& Parts Catalog.

imagePRESSC10000VP imagePRESSC8000VP 10000 8000